News
Gas flow is in line with nominations
Eustream has recorded changes in nominations. Reduced volumes, however, are pre-announced and confirmed by the nominations. Therefore Eustream can conclude that gas transmission corresponds with confirmed volumes. Our company transports to customers the same gas volume, which is brought to the border. Transmission system operator doesn´t have reason to examine the reasons of fluctuation in gas volumes nominated by its customers. Transmission volumes depend on the relations of suppliers and customers (shippers).
Vojany-Užhorod pipeline was put into commercial operation
High representative of the European union Klaus-Dieter Borchardt together with Slovak PM Robert Fico and Ukrainian PM Arseniy Yatsenyuk inaugurated Vojany-Uzhorod pipeline. Symbolic turning the valve for the first time in history started reverse gas flow from Slovakia to Ukraine.
Announcement of a start of testing period for the Vojany–Uzhorod pipeline
Eustream announces that from 16th August 2014 will start the testing phase for the Vojany–Uzhorod pipeline. The testing operation will comprise gradually build-up phase, verification and reliability checks. During this phase the interruptible capacity will be offered. After the finalization of testing operation at the beginning of September 2014 the normal commercial operation might start.
The Inauguration of the Vojany-Uzhorod pipeline
Eustream invites journalists who would like to participate in the official launch of commercial transportation of gas to Ukraine, to timely accredit themselves.
Eustream´s new gas interconnection projects are advancing
Slovak gas transmission system operator Eustream is progressing in implementation of its long term strategic plans to secure gas infrastructure interconnections with Hungary and Poland. The new interconnection point Budince with Ukraine is also on track as envisaged in the Memorandum of Understanding with Ukrtransgaz.