News
Notification about Open Season Procedure of the SK-HU Interconnector
- Due to circumstances beyond the control of the TSOs the currently published Rules of the Open Season for the SK-HU Interconnector will be significantly modified, - Therefore the organizing TSOs decided to withdraw the currently published SK-HU Interconnector Open Season Rules, - The expected new Rules of the Open Seasons will be available and published by the 17th of December 2014, - The organizing TSOs ask Applicants not to send binding bids and submissions until further notice
Change in the deadline for submission of the binding bids in Open Season for the SK-HU Interconnector
The deadline for submission of the binding bids in Open Season for the SK-HU Interconnector is prolonged to Wednesday the 17th December 2014 at 16:00 CET. The organizing TSOs are at this moment also considering the modification of time period of the offered capacities in the actual Open Season Rules.
Eustream is prepared to put the Slovak-Hungarian pipeline into operation
Eustream is prepared to put the Slovak-Hungarian pipeline into test operation. Company filled the pipeline with gas and prepared the transmission system for the flow test. All systems have been checked and adjusted in order to enable immediate start of the transmission.
Evaluation of the Vojany-Uzhorod pipeline Open Season
Increased interruptible capacity of 4.5 million cubic meters per day (46,800 MWh) was booked by shippers until the end of 2019. Interest of the shippers significantly exceeded the offered capacity. Entire booked capacity of the Vojany-Uzhorod pipeline has reached 11,5 bcm/year (31,5 mcm/day). Increased interruptible capacity has been increased due to the technical measures taken on the Ukrainian side.
Eustream announces Open Season procedure SK-HU
Eustream announces Open Season procedure for the capacity at the Slovak-Hungarian Interconnector, in order to offer the capacity in a transparent and non-discriminatory way.